Ero sivun ”World Trade Center (2001–)” versioiden välillä

[katsottu versio][katsottu versio]
Poistettu sisältö Lisätty sisältö
Rivi 123:
| align=center data-sort-value="2016-03-05" {{n/a|2017}}
| data-sort-value="2020-01-01" |{{circa|2020}}
|
| Construction was to begin in December 2014 when the removal of the temporary PATH station commenced.<ref name="nyc.gov">{{cite web|url=http://www.nyc.gov/html/dot/downloads/LMBC/Community-Meeting-205-6-26-14.pdf|title=Lower Manhattan Community Meeting #205|publisher=New York City Department of Transportation|format=pdf|date=June 26, 2014|accessdate=January 7, 2016}}</ref> However, after a downgrade of plans, the construction date was moved back indefinitely. After the PATH station is removed, construction may start. In November 2015, it was announced that [[Joshua Prince-Ramus]] was awarded the contract to design the building. On September 8, 2016, the design was revealed to mostly positive reviews from architecture critics. Construction will begin in early 2017, after the temporary PATH station is removed. The center is planned to open in 2020.<ref name="Pogrebin 2015">{{cite web | last=Pogrebin | first=Robin | title=Ground Zero Arts Center to Shrink Further | website=The New York Times | date=2015-07-23 | url=https://www.nytimes.com/2015/07/24/arts/design/ground-zero-arts-center-to-shrink-further.html | accessdate=2015-10-05}}</ref>
|
| data-sort-value="5"|ConstructionRakennusurakkaa notei startedole aloitettu
|-
| [[Vehicular Security Center]]
| align=center {{n/a}}
| data-sort-value="2011-11-10" | November 10,. marraskuuta 2011
| data-sort-value="2017-03-01" | {{circa|2017}}
|
| The underground complex and the checkpoint of the <abbr title="Vehicular Security Center">VSC</abbr> is completed, but it has not yet opened.<ref name="nyc.gov"/>
|
| data-sort-value="4"|CompletedValmis, butmutta notei in use.käytössa
|-
| [[Liberty Park (Manhattan)|Liberty Park]]
| align=center | [[File:Liberty Street park NW opening day jeh.jpg|175px]]
| data-sort-value="2013-11-20" | November 20,. marraskuuta 2013
| data-sort-value="2016-06-29" | June 29,. kesäkuuta 2016
|
| Construction began in November 2013 when the Vehicular Security Center's roof was structurally complete. Opened in June 2016.<ref>{{cite news |last=Gelman |first=Max |title=New elevated park opens near the WTC 9/11 Memorial |website=NY Daily News |date=2016-06-29 |url= http://www.nydailynews.com/new-york/new-elevated-park-opened-wtc-9-11-memorial-article-1.2693514 |accessdate=2016-07-01}}</ref><ref>{{cite news |last=Walker |first=Ameena |title=See photos of WTC's Liberty Park on its long-awaited opening day |website=Curbed NY |date=2016-06-29 |url= http://ny.curbed.com/2016/6/29/12060736/liberty-park-opening-day-world-trade-center |accessdate=2016-07-01}}</ref>
|
| data-sort-value="1"|CompletedValmis
|-
| [[St. Nicholas Greek Orthodox Church]]
| align=center {{n/a}}
| data-sort-value="2014-10-18" | October 18,. lokakuuta 2014
| data-sort-value="2017-06-01" | {{circa|n. 2017}}
|
| Construction began with the groundbreaking occurring on October 18, 2014, and topped out on November 29, 2016.<ref>{{cite news |last=Papapostolou |first=Anastasios |title=St. Nicholas Greek Orthodox Church Got Its Cross Back |publisher=[[Greek Reporter]] |date=2016-11-29 |url=http://usa.greekreporter.com/2016/11/29/st-nicholas-greek-orthodox-church-got-its-cross-back/ |accessdate=2017-02-10}}</ref> The structure should be complete by early 2017.<ref>{{cite news |url=https://online.wsj.com/articles/a-church-near-ground-zero-reimagined-1413420884 |title=A Church Near Ground Zero Reimagined |author=Ralph Gardner Jr. |date=October 16, 2014 |work=WSJ}}</ref>
|
| data-sort-value="3" |Structurally topped-outRakenteilla
|-
| [[Borough of Manhattan Community College#Fiterman Hall and the September 11 attacks|Fiterman Hall]]
Rivi 157:
|
|
| data-sort-value="3" |CompletedValmis
|}<section end="construction-table"/><!--end transclusion for use in [[World Trade Center site#Construction]]-->